资源类型

期刊论文 1343

会议视频 41

会议信息 1

年份

2023 82

2022 122

2021 107

2020 107

2019 71

2018 64

2017 68

2016 60

2015 63

2014 57

2013 47

2012 49

2011 52

2010 60

2009 50

2008 51

2007 50

2006 36

2005 39

2004 30

展开 ︾

关键词

信息技术 13

数学模型 13

模型试验 9

数值模拟 8

智能制造 7

模型 7

信息化 6

COVID-19 4

农业科学 4

工程管理 4

能源 4

GM(1 3

不确定性 3

碳中和 3

经济 3

计算机模拟 3

1)模型 2

2021全球工程前沿 2

BIM 2

展开 ︾

检索范围:

排序: 展示方式:

Critical review of studies on building information modeling (BIM) in project management

Albert P. C. CHAN, Xiaozhi MA, Wen YI, Xin ZHOU, Feng XIONG

《工程管理前沿(英文)》 2018年 第5卷 第3期   页码 394-406 doi: 10.15302/J-FEM-2018203

摘要:

Building information modeling (BIM) and project management are two major research topics that accommodate large volumes of research efforts. BIM has been interpreted as a process technology that aids in enhancing project management. Hence, the investigation from an interdisciplinary perspective of the two concepts may bring new insights to understanding related research. In this paper, a structural approach is adopted in reviewing BIM studies in project management from 2005 to 2017 within identified target journals. This review aims to classify the major research directions and topics for BIM research in project management. Moreover, given BIM’s potential for application in project management, this paper attempts to establish a fundamental research foundation for a new paradigm of project management that incorporates BIM, namely, BIM-based project management. The preliminary result suggests that BIM research in project management develops drastically in the examined duration. The research directions of BIM studies in project management include enabling BIM as a technology in project management; BIM application as a solution for specific project management scopes; integration issues of BIM that have been brought to project management; institutional environment and regulatory governance of BIM in realizing project management strategies; and analysis of effects and strategies of BIM adoption and implementation in projects. The directions and trends are then analyzed to develop a research route for BIM studies in project management. Finally, conclusions focus on the relations of the research directions, as well as the contributions and theoretical implications of this review. Future research areas are also recommended.

关键词: building information modeling (BIM)     project management     review     BIM-based project management    

建筑信息物理模型:一种建筑信息描述新形式

杨启亮,邢建春

《中国工程科学》 2023年 第25卷 第5期   页码 222-232 doi: 10.15302/J-SSCAE-2023.07.027

摘要: BIM handbook: A guide to building information modeling for owners, managers, designers, engineers andBuilding information modeling BIM application framework: The process of expanding from 3D to computableBuilding information modeling BIM application framework: The process of expanding from 3D to computableBIM handbook: A guide to building information modeling for owners, managers, designers, engineers andA foundation model for building digital twins: A case study of a chiller [J].

关键词: 建筑信息描述;信息模型技术;建筑信息模型(BIM);数字孪生;建筑工业软件    

Impacts of building information modeling (BIM) implementation on design and construction performance:

Dongping CAO, Heng LI, Guangbin WANG

《工程管理前沿(英文)》 2017年 第4卷 第1期   页码 20-34 doi: 10.15302/J-FEM-2017010

摘要: Drawing on resource dependence theory, this paper develops and empirically tests a model for understanding how the implementation of building information modeling (BIM) in construction projects impacts the performance of different project participating organizations through improving their interorganizational collaboration capabilities. Based on two sets of survey data collected from designers and general contractors in BIM-based construction projects in China, the results from partial least squares analysis and bootstrapping mediation test provide clear evidence that BIM-enabled capabilities of information sharing and collaborative decision-making as a whole play a significant role in determining BIM-enabled efficiency and effectiveness benefits for both designers and general contractors. The results further reveal that designers and general contractors benefit from project BIM implementation activities significantly non-equivalently, and that this non-equivalence closely relates to the different roles played by designers and general contractors in BIM-enabled interorganizational resource exchange processes. The findings validate the resource dependence theory perspective of BIM as a boundary spanning tool to manage interorganizational resource dependence in construction projects, and contribute to deepened understandings of how and why project participating organizations benefit differently from the implementation of interorganizational information technologies like BIM.

关键词: building information modeling     interorganizational collaboration     construction project performance     resource dependence theory     partial least squares modeling    

Framework based on building information modeling, mixed reality, and a cloud platform to support information

Berardo NATICCHIA, Alessandra CORNELI, Alessandro CARBONARI

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 131-141 doi: 10.1007/s42524-019-0071-y

摘要: The quality of information flow management has a remarkable effect on the entire life cycle of buildings. Manual retrieval of technical specifications and features of building components and their performance assessment leads to increased cost and time and efficiency reduction, especially during the facility management (FM) stage. The introduction of building information modeling (BIM) in the construction industry can provide a valuable means of improving the organization and exchange of information. BIM tools integrate multiple levels of information within a single digital model of a building. Nevertheless, the support given by BIM to FM is far from being fully effective. Technicians can benefit from real-time communication with the data repository whenever the need for gathering contextual information and/or updating any data in the digital model arises. The framework proposed in this study aims to develop a system that supports on-site operations. Information requirements have been determined from the analyses of procedures that are usually implemented in the building life cycle. These studies set the standard for the development of a digital model of a building, which will be shared among various actors in charge of FM and accessed via a cloud platform. Moreover, mixed reality is proposed to support specific information that is relevant to geometric features and procedures to be followed by operators. This article presents three use-cases supported by the proposed framework. In addition, this research article describes the first proof of concept regarding real-time support for FM.

关键词: information flow management     BIM     mixed reality     common data environment     facility management    

Understanding barriers to BIM implementation: Their impact across organizational levels in relation toBIM maturity

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

《工程管理前沿(英文)》 2021年 第8卷 第2期   页码 236-257 doi: 10.1007/s42524-019-0088-2

摘要: This multiple case study of a contracting firm contributes to understanding the barriers that organizations face during the implementation of building information modeling (BIM) by providing insights into the impact of these barriers across different organizational levels (i.e., from top management to project teams) and by relating these barriers to different degrees of BIM maturity. First, we observe the dominance of barriers related to the motivation, competence, and time capacity of people across all levels of an organization. Second, the cluster of barriers at the middle-management level highlights the important role of this level in reducing these barriers. Third, only those cases with a low level of BIM maturity have struggled with lack of top management support, thereby highlighting the importance of such support in achieving BIM maturity growth. High BIM maturity situations are more prone to externally oriented barriers in attempting to further leverage the benefits of BIM. Our study provides insights on where to focus BIM implementation measures and how to enhance organizational BIM maturity.

关键词: building information modeling     implementation barriers     maturity     organizational levels    

Overview and problems of BIM implementation in Japan

Takashi KANETA, Shuzo FURUSAKA, Nisi DENG

《工程管理前沿(英文)》 2017年 第4卷 第2期   页码 146-155 doi: 10.15302/J-FEM-2017007

摘要: This paper aims to overview Building Information Modeling (BIM) implementation and problems of BIM implementation in Japan. First, BIM implementation guidelines and pilot projects are introduced. Then, some popular BIM software together with typical implementation cases are provided. BIM implementation in Japan is not always encouraged via a top-down consensus in architectural firms and general contractors, as the client and architects can reduce the project risk inherent in design and drawings by transferring these tasks to a general contractor. The paper finally discusses the problems in project management to present a strategy to develop a new version of BIM that will provide value to all of the stakeholders of a project.

关键词: Building Information Modeling     general contractor     architect     drawing     procurement     project management    

基于物联网和BIM的城市生命线运维管理研究

陈兴海,丁烈云

《中国工程科学》 2014年 第16卷 第10期   页码 89-93

摘要:

分析了城市生命线运维阶段存在的问题,基于物联网和建筑信息模型(BIM)的应用特点,讨论了其在城市生命线运维管理阶段的适应性,提出了基于BIM

关键词: 物联网     BIM     城市生命线工程     运维管理    

Situational Awareness in Construction and Facility Management

Burcu Akinci

《工程管理前沿(英文)》 2014年 第1卷 第3期   页码 283-289 doi: 10.15302/J-FEM-2014037

摘要: Engineers and managers involved in construction and facility/infrastructure operations need situational awareness about the as-is conditions when making daily decisions and developing short- and long-term plans. Yet, currently situational awareness of engineers is often challenged due to missing data and the available data not being in a format that is easily accessible and actionable. Advances in reality capture technologies, such as 3-dimensional (3D) imaging, in-situ sensing, equipment on-board instrumentation and electronic tagging, streamline the capturing of the as-is conditions on job sites. The data collected from these technologies, integrated with building information models depicting the as-planned conditions, can help in creating and storing the history of as-is conditions of a facility to support a variety of decisions that engineers and managers need to make. While the opportunities associated with integrating building information models and data capture technologies are compelling, several challenges need to be addressed through research for effective usage of these technologies. Such challenges include assessing the accuracy of the data collected at the field, developing and evaluating data processing and data fusion approaches, formalizing integrated representation of building information models and sensor and other relevant data, and investigating and developing approaches for analyzing and visualizing such integrated information models. This paper provides examples of recent research studies done at the Civil and Environmental Engineering Department at Carnegie Mellon University that demonstrate opportunities associated with integrating building information models and sensor information for facility operations.

关键词: building information models (BIM)     sensors     facility operations and management     construction management     situational awareness    

Toward deep impacts of BIM on education

Žiga TURK, Andreja ISTENIČ STARČIČ

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 81-88 doi: 10.1007/s42524-019-0035-2

摘要: Building information models (BIM) provide a way to represent buildings and communicate about them. In teaching engineering, we also need representations of buildings and are communicating knowledge about them. While teaching engineering we refer to the very same real-world objects that have an explicit conceptualization in BIM. This explicit conceptualization did not exist in the age when design communication relied on drawings and documents. The question that this paper asks is this: due to BIM, communication in the industry has changed. Should communication of engineering knowledge – teaching – change as well and how? While much has been written about teaching BIM and incorporating BIM into the curricula, this paper is exploring the general impact of BIM on engineering education. It grounds earlier work (Turk, 2018) on insights from pedagogy. Five scenarios of the interplay between BIM-influenced engineering communication and teaching are presented. The paper argues that ignoring BIM may create a cognitive dissonance between academic learning and industrial work. We are finding that the impact of BIM is twofold: vertically there is a need to establish a reference between knowledge concepts (in teaching building) and information objects (in building information models). Horizontally BIM is an integration technology that allows for a more holistic design and planning. Both the language of individual courses as well as cross references and synergies among courses should change. A “T” style structure of the courses around BIM is proposed as a basis for integrated curriculum. Pedagogical approaches based on deep learning, model based learning and project based learning are suggested.

关键词: engineering education     building information modelling     engineering communication     curriculum development    

Construction Technology of Off-Site Precast Concrete Buildings

Ting Gong,Jian Yang,Hao Hu,Feng Xu

《工程管理前沿(英文)》 2015年 第2卷 第2期   页码 122-124 doi: 10.15302/J-FEM-2015039

摘要: The industrialization of building construction is gradually becoming a new choice of construction technology driven by some great advantages such as high efficiency in construction, low energy consumption and environmental friendliness. Construction management plays an important part to ensure the quality of projects. A comparison between traditional on-site and modern off-site construction methods has been conducted. The streamlining of the process including the fabrication, transportation, stacking and assembling of precast components has also been analyzed with a discussion on the BIM application in the process.

关键词: off-site construction     precast concrete     modular construction     construction management     building information model (BIM)    

Investigating the challenges related to combining BIM and Last Planner System on construction sites

Conrad BOTON, Yaya PITTI, Daniel FORGUES, Ivanka IORDANOVA

《工程管理前沿(英文)》 2021年 第8卷 第2期   页码 172-182 doi: 10.1007/s42524-019-0086-4

摘要: The construction industry is facing a gradual but important transformation toward more productivity and collaboration. In this framework, two major approaches are often cited in the literature as having the potential to improve the practices in the industry: Building Information Modeling (BIM) and Lean Construction. Several scientific studies have demonstrated the synergy of these two approaches and very recent research has reported positive results from the use of software applications as support for their implementation on construction sites. However, the stakes of such integration have been very little studied. This article presents the results of a research project conducted within a general contractor firm that decided to implement BIM and Last Planner System (LPS) on its construction sites. The research uses a four-stage action research approach, including the characterization of the research issue, the establishment of an action plan, its implementation and its evaluation. Compared to recent related studies, the research is less enthusiastic. While it highlights the need for new tools to improve production planning and control, it also points to a strong resistance to change by practitioners at the site. They emphasize the necessity for adequate pre-service training and the need for new resources that can work full-time on the ongoing training of site teams. In addition, some limitations of the tool lead workers to believe that it can quickly become a factor that slows down their daily work rather than improving it. Based on the advice of professionals, the paper formulates some recommendations to the industry, the researchers and the software developers.

关键词: Building Information Modeling     Last Planner System     construction site     lean construction    

Model server enabled management of collaborative changes in building information models

Muhammad Tariq SHAFIQ, Jane MATTHEWS, Steve LOCKLEY, Peter E.D. LOVE

《工程管理前沿(英文)》 2018年 第5卷 第3期   页码 298-306 doi: 10.15302/J-FEM-2018009

摘要:

The issues and challenges involved in controlling the collaborative changes in a Building Information Modeling (BIM) data repository, in a multi-model collaboration environment, are discussed. It is suggested that managing iterative changes in BIMs is a database problem, exacerbated by the long transaction times needed to support collaborative design progression. This is yet to be resolved in the construction industry and better solutions are needed to support the underlying workflows and computing operations for seamless collaboration on BIMs. With this in mind, this paper proposes the use of the structural and semantic characteristics of BIM objects as a mechanism for tracking changes across co-developed solutions. The creation of object signatures, using hash codes derived from their characteristics, provides a potential mechanism for object comparison and effective change recognition and management.

关键词: building information models     collaboration     IFC     change management     model-servers    

Development of a BIM-based holonic system for real-time monitoring of building operational efficiency

Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 89-103 doi: 10.1007/s42524-019-0037-0

摘要: In the wide context of facility management, several processes, such as operations, maintenance, retrofitting, and renovations, ensure that buildings comply with the principles of efficiency, cost-effectiveness, and indoor comfort. Apart from ordinary operation, facility management is responsible for the renovation of and long-term performance improvement of building facilities. In such a scenario, the cyber–physical system (CPS) paradigm with holonic architecture, which is the focus of this study, can successfully guide the operation management and long-term refurbishment processes of buildings. Analogous to the manufacturing field, the developed CPS maximizes holons’ self-configuration and self-organization and overall throughput effectiveness metrics to detect the best corrective actions toward system improvements. Consequently, suggestions and lessons learned from the evaluation of building efficiency are redirected to the building information model. Hence, the digital model acts as a repository of currently available equipment for operations management and the history of diagnoses that support decision-making during the maintenance, retrofitting, and renovation processes. Evidently, the repeated detection of a specific issue, which is unaffected by operations management, should be considered an opportunity to act and enhance the performances of existing building components. Similar to a goods-producing industry, the building management system developed in this study applies the aforementioned methodology to provide services related to indoor comfort and building health. This approach indicates that a method for automatic real-time diagnosis is tested in a case study consisting of a multi-use and large public building. The current paper, which is an extended version of the one presented in the Creative Construction Conference 2018, deepens the decision support tool and the supervision policy. Moreover, the developed system is contextualized by providing an example of use case and highlighting the step forward in the field of smart buildings.

关键词: BIM     building management system     cyber-physical system     facility management     holonic system    

美国绿色BIM应用现状及其对中国建设领域的影响分析

杨宇,尹航

《中国工程科学》 2011年 第13卷 第8期   页码 103-112

摘要:

近年来,绿色BIMbuilding information modeling)受到美国等发达国家建设领域的广泛关注与重视,多数运用绿色BIM尽管绿色BIM实践中仍存在诸多问题,但绿色BIM已成为建设领域未来发展的必然趋势。笔者基于绿色BIM在美国的应用现状对其在中国建设领域的影响进行了初步分析,分析认为,相较于美国的绿色BIM,中国的绿色BIM起步较晚,技术上也存在巨大差距,在发展过程中,应充分借鉴绿色BIM在美国的成熟实践经验,并结合中国建设领域的特点,形成符合中国国情的绿色BIM操作流程、重视绿色BIM在不同类型建筑工程项目中的运用、重视建筑材料及可再生能源的选择和使用、加强BIM软件及相关技术本土化和政府投入,以有效推动绿色建筑发展

关键词: BIM     绿色BIM     绿色建筑     可持续性     经济性     建设领域    

Owner-dominated building information modeling and lean construction in a megaproject

Mingyue LI, Zhuoling MA, Xi TANG

《工程管理前沿(英文)》 2021年 第8卷 第1期   页码 60-71 doi: 10.1007/s42524-019-0042-3

摘要: The integration of building information modeling (BIM) and lean construction (LC) provides a solution for the management of megaprojects. Previous studies have generally focused on the theoretical or empirical adoption of BIM and LC. Moreover, only a few studies have examined the approach of simultaneously using BIM and LC in megaprojects. Therefore, an intensive study on the application of BIM and LC in megaprojects, particularly to explore considerably effective integrated application modes of BIM and LC in megaprojects, will substantially promote the management efficiency of megaprojects. The current study describes a method that integrates owner-dominated BIM and LC that was developed in a case study. The proposed method provides a framework for all stakeholders to use BIM and LC in a megaproject dominated by the owner. The interactional relations among the owner, BIM, and LC were analyzed and positive interactions were identified. These positive interactions served as a basis for the implementation of this integrated approach in a case study and could be applied to other megaprojects. The megaproject (i.e., airport construction project) was examined to verify the performance of the developed method. Results showed that the integration of BIM and LC dominated by the owner can improve management performance and achieve high quality standard.

关键词: building information modeling     lean construction     airports     project management    

标题 作者 时间 类型 操作

Critical review of studies on building information modeling (BIM) in project management

Albert P. C. CHAN, Xiaozhi MA, Wen YI, Xin ZHOU, Feng XIONG

期刊论文

建筑信息物理模型:一种建筑信息描述新形式

杨启亮,邢建春

期刊论文

Impacts of building information modeling (BIM) implementation on design and construction performance:

Dongping CAO, Heng LI, Guangbin WANG

期刊论文

Framework based on building information modeling, mixed reality, and a cloud platform to support information

Berardo NATICCHIA, Alessandra CORNELI, Alessandro CARBONARI

期刊论文

Understanding barriers to BIM implementation: Their impact across organizational levels in relation toBIM maturity

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

期刊论文

Overview and problems of BIM implementation in Japan

Takashi KANETA, Shuzo FURUSAKA, Nisi DENG

期刊论文

基于物联网和BIM的城市生命线运维管理研究

陈兴海,丁烈云

期刊论文

Situational Awareness in Construction and Facility Management

Burcu Akinci

期刊论文

Toward deep impacts of BIM on education

Žiga TURK, Andreja ISTENIČ STARČIČ

期刊论文

Construction Technology of Off-Site Precast Concrete Buildings

Ting Gong,Jian Yang,Hao Hu,Feng Xu

期刊论文

Investigating the challenges related to combining BIM and Last Planner System on construction sites

Conrad BOTON, Yaya PITTI, Daniel FORGUES, Ivanka IORDANOVA

期刊论文

Model server enabled management of collaborative changes in building information models

Muhammad Tariq SHAFIQ, Jane MATTHEWS, Steve LOCKLEY, Peter E.D. LOVE

期刊论文

Development of a BIM-based holonic system for real-time monitoring of building operational efficiency

Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI

期刊论文

美国绿色BIM应用现状及其对中国建设领域的影响分析

杨宇,尹航

期刊论文

Owner-dominated building information modeling and lean construction in a megaproject

Mingyue LI, Zhuoling MA, Xi TANG

期刊论文